What the work should include
The project discussion should identify the selected system, substrate and treatment of corners, openings and connections. Installation and any required testing need to follow that system's instructions and applicable project requirements. Components should not be mixed on the assumption that every waterproofing product is interchangeable.
Choices to make before work starts
Confirm details for niches, curbs and glass attachment points before tile covers them. Ask how the completed underlying work will be documented. The visible surface can be attractive while still leaving the assembly uncertain, so keep the technical system clear in the written scope.
What affects the estimate and schedule
Existing damage, shower geometry and detail complexity affect labor. Send the current shower, selected finishes and any known history of leakage.
Helpful project information
- Full-room photographs and fixture positions
- Products being retained and proposed replacements
- Essential access needs during the work
A question about this work
Is tile and grout the entire waterproofing system?
No. The waterproofing approach beneath the tile needs to be specified and installed as a coordinated assembly.
For technical background, see our tile shower installation guide. Your selected materials and project requirements determine the actual installation or finishing instructions.